Strategic Execution Plans
Strategic Execution Plans
2025 SEP and Amendments
| BOE Report No. and Approval Date |
Subject |
|---|---|
| 2026-03-10 Approved 323‐25-26 | Define and Approve 3 Charter School Facilities Upgrade Projects |
| 2026-03-10 Approved 293‐25-26 | Define and Approve 65 Board District Priority and Region Priority Projects |
| 2026-03-10 Approved 269‐25-26 | Define and Approve 2 Projects to Provide Critical Replacements and Upgrades of School Building/Site Systems and Components |
| 2025-12-16 Approved 191‐25-26 | Define and Approve 3 Projects to Provide Critical Replacements and Upgrades of School Building/Site Systems and Components |
| 2025-12-16 Approved 190‐25-26 | Define and Approve 2 Early Education Center Outdoor Classroom and Campus Upgrade Projects |
| 2025-12-16 Approved 189‐25-26 | Define and Approve 7 Board District Priority and Region Priority Projects |
| 2025-12-16 Approved 071‐25-26 | Define and Approve the 24th Street Elementary School Barrier Removal Project |
| 2025-11-18 Approved 154‐25-26 | Define and Approve 6 Accessibility Enhancement Projects |
| 2025-11-18 Approved 151‐25-26 | Define and Approve 30 Projects to Provide Critical Replacements and Upgrades of School Building/Site Systems and Components |
| 2025-11-18 Approved 150‐25-26 | Define and Approve 3 Early Education Center Outdoor Classroom Projects |
| 2025-11-18 Approved 110‐25-26 | Define and Approve 18 Board District Priority and Region Priority Projects |
| 2025-09-16 Approved 048‐25-26 | Define and Approve the Tweedy Learning Center Roofing Replacement Project |
| 2025-09-16 Approved 047‐25-26 | Define and Approve 3 Projects to Provide Critical Replacements and Upgrades of School Building/Site Systems and Components |
| 2025-09-16 Approved 046‐25-26 | Define and Approve 21 Board District Priority and Region Priority Projects |
| 2025-09-16 Approved 045‐25-26 | Define and Approve the Harte Preparatory Middle School Barrier Removal Project |
| 2025-09-16 Approved 044‐25-26 | Define and Approve 4 Sustainable Environment Enhancement Developments for Schools (SEEDS) Projects |
| 2025-09-16 Approved 030‐25-26 | Define and Approve the Dorsey High School Bakery Classroom & Kitchen Project with Donations from Puratos Bakery |
| 2025-09-16 Approved 019‐25-26 | Approve a New Memorandum of Understanding (MOU) with the Los Angeles Department of Water and Power (LADWP) and Allocate $20 Million for an Energy Efficient Lighting Upgrade Program |
| 2025-08-26 Approved 014‐25-26 | Define and Approve 27 Board District Priority and Region Priority Projects |
| 2025-08-26 Approved 012‐25-26 | Define and Approve 2 Early Education Center Outdoor Classroom Projects |
| 2025-08-26 Approved 011‐25-26 | Define and Approve 7 Projects to Provide Critical Replacements and Upgrades of School Building/Site Systems and Components |
| 2025-06-03 Approved 383‐24-25 | Define and Approve 5 Sustainable Environment Enhancement Developments for Schools (SEEDS) Projects |
| 2025-06-03 Approved 382‐24-25 | Define and Approve 27 Board District Priority and Region Priority Projects |
| 2025-06-03 Approved 380‐24-25 | Define and Approve the Birmingham Community Charter High School Aquatic Facility Replacement Project |
| 2025-06-03 Approved 377‐24-25 | Define and Approve 5 Accessibility Enhancement Projects and 2 Barrier Removal Projects |
| 2025-06-03 Approved 269‐24-25 | Define and Approve 3 Campus Reconstruction Projects |
| 2025-05-13 Approved 328‐24-25 | Define and Approve 17 Board District Priority and Region Priority Projects |
| 2025-05-13 Approved 327‐24-25 | Define and Approve 6 Sustainable Environment Enhancement Developments for Schools (SEEDS) Projects |
| 2025-05-13 Approved 326‐24-25 | Define and Approve the 2025‐2026 Education Code Section 47614 (Proposition 39) Facilities Renovation Effort |
| 2025-05-13 Approved 324‐24-25 | Define and Approve 2 Projects to Provide Adult and Career Education Facilities Upgrades |
| 2025-05-13 Approved 322‐24-25 | Define and Approve 86 Projects to Provide Critical Replacements and Upgrades of School Building/Site Systems and Components |
| 2025-05-13 Approved 304‐24-25 | Define and Approve 3 Early Education Center Outdoor Classroom Projects |
| 2025-04-08 Approved 268‐24-25 | Approve the Redefinition of the Bell High School Classroom Replacement & HVAC Project |
| 2025-04-08 Approved 267‐24-25 | Define and Approve the Verdugo Hills High School New Baseball Scoreboard Project |
| 2025-04-08 Approved 264‐24-25 | Define and Approve 22 Board District Priority and Region Priority Projects |
| 2025-04-08 Approved 262‐24-25 | Define and Approve the Lemay Early Education Center Outdoor Classroom and Campus Upgrade Project |
| 2025-04-08 Approved 261‐24-25 | Define and Approve 4 Projects to Provide Critical Replacements and Upgrades of School Building/Site Systems |
2024 SEP and Amendments
| BOE Report No. and Approval Date |
Subject |
|---|---|
| 2025-03-11 Approved 247-24-25 | Align Funding Strategies for 3 School Facilities Projects/Programs Funded by Certificates of Participation (COPs 2023 Series A) with the School Upgrade Program Framework and Measure US Priorities and Implementation Strategies |
| 2025-03-11 Approved 236-24-25 | Define and Approve 7 Playground and Campus Exterior Upgrade Projects |
| 2025-03-11 Approved 233-24-25 | Define and Approve 24 Classroom Upgrade Projects |
| 2025-03-11 Approved 232-24-25 | Define and Approve 4 Board District Priority and Region Priority Projects |
| 2025-03-11 Approved 227-24-25 | Define and Approve 4 Charter School Facilities Upgrade Projects |
| 2025-02-11 Approved 204-24-25 | Define and Approve 6 Sustainable Environment Enhancement Developments for Schools (SEEDS) Projects |
| 2025-02-11 Approved 198-24-25 | Define and Approve 11 Board District Priority and Region Priority Projects |
| 2025-02-11 Approved 190-24-25 | Define and Approve 3 Projects to Provide Critical Replacements and Upgrades of School Building/Site Systems and Components |
| 2025-02-11 Approved 166-24-25 | Define and Approve 21 Solar Photovoltaic Projects |
| 2025-01-14 Approved 151-24-25 | Define and Approve 16 Board District Priority and Region Priority Projects |
| 2025-01-14 Approved 149-24-25 | Define and Approve 2 Projects to Provide Critical Replacements and Upgrades of School Building/Site Systems and Components |
| 2025-01-14 Approved 101-24-25 | Define and Approve 7 Playground and Campus Exterior Upgrade Projects |
| 2024-11-19 Approved 108-24-25 | Define and Approve 26 Board District Priority and Region Priority Projects |
| 2024-11-19 Approved 107-24-25 | Define and Approve 3 Charter School Facilities Upgrade Projects |
| 2024-11-19 Approved 103-24-25 | Define and Approve 2 Accessibility Enhancement Projects |
| 2024-11-19 Approved 102-24-25 | Define and Approve 2 Projects to Provide Critical Replacements and Upgrades of School Building/Site Systems and Components |
| 2024-10-22 Approved 064-24-25 | Define and Approve 12 Classroom Upgrade Projects |
| 2024-10-22 Approved 063-24-25 | Define and Approve 13 Board District Priority and Region Priority Projects |
| 2024-10-22 Approved 054-24-25 | Define and Approve 2 Early Education Center Outdoor Classroom and Campus Upgrade Projects |
| 2024-09-10 Approved 035-24-25 | Define and Approve 13 Board District Priority and Region Priority Projects |
| 2024-08-13 Approved 015-24-25 | Define and Approve 25 Board District Priority and Region Priority Projects |
| 2024-08-13 Approved 014-24-25 | Authorization to Increase the Charter Augmentation Grant for the Vaughn Next Century Learning Center New Two-Story Addition Project |
| 2024-06-04 Approved 304-23-24 | Define and Approve 4 Accessibility Enhancement Projects and 2 Barrier Removal Projects |
| 2024-06-04 Approved 301-23-24 | Authorization to Accept $5 Million from Lulu’s Place for the Benefit of the Baseball and Softball Fields at Westchester Enriched Sciences Magnets |
| 2024-06-04 Approved 299-23-24 | Define and Approve 8 Classroom Upgrade Projects |
| 2024-06-04 Approved 297-23-24 | Define and Approve 4 Classroom Replacement Projects |
| 2024-06-04 Approved 295-23-24 | Define and Approve 6 Proposition 39 Co-Located/Shared Facilities Improvement Projects |
| 2024-06-04 Approved 293-23-24 | Define and Approve 16 Projects to Provide Critical Replacements and Upgrades of School Building/Site Systems and Components |
| 2024-06-04 Approved 281-23-24 | Define and Approve 9 Board District Priority and Region Priority Projects |
| 2024-05-07 Approved 270-23-24 | Define and Approve 14 Board District Priority and Region Priority Projects and Cancel 3 Board District Priority and Region Priority Projects |
| 2024-05-07 Approved 269-23-24 | Define and Approve the 2024-2025 Education Code Section 47614 (Proposition 39) Facilities Renovation Effort |
| 2024-05-07 Approved 262-23-24 | Define and Approve the Porter Ranch Community School Phase 2 Classroom Addition Project |
| 2024-05-07 Approved 252-23-24 | Define and Approve 3 Early Education Center Outdoor Classroom and Campus Upgrade Projects |
| 2024-04-09 Approved 242-23-24 | Define and Approve the East Los Angeles Occupational Center Classroom Replacement Project |
| 2024-04-09 Approved 233-23-24 | Define and Approve 6 Internet Protocol Converge Projects at Adult and Career Education Campuses |
| 2024-04-09 Approved 243-23-24 | Define and Approve 13 Board District Priority and Region Priority Projects |
2023 SEP and Amendments
| BOE Report No. and Approval Date |
Subject |
|---|---|
| 2024-03-12 Approved 215-23-24 | Define and Approve 8 Playground and Campus Exterior Upgrade Projects |
| 2024-03-12 Approved 214-23-24 | Define and Approve 3 Athletic Facilities Upgrade Projects |
| 2024-03-12 Approved 212-23-24 | Define and Approve the Bridge Street Elementary School Critical Barrier Removal Project |
| 2024-03-12 Approved 211-23-24 | Define and Approve 3 Classroom Replacement Projects |
| 2024-03-12 Approved 197-23-24 | Define and Approve 15 Board District Priority and Region Priority Projects |
| 2024-02-13 Approved 179-23-24 | Define and Approve 6 Board District Priority and Region Priority Projects |
| 2024-02-13 Approved 170-23-24 | Define and Approve the Nevin Avenue Elementary School Library Renovation Project |
| 2024-01-23 Approved 155-23-24 | Define and Approve 6 Board District Priority and Region Priority Projects |
| 2024-01-23 Approved 151-23-24 | Define and Approve the Angeles Mesa Elementary School Auditorium Ceiling Replacement Project |
| 2023-12-12 Approved 130-23-24 | Define and Approve 3 Athletic Facilities Upgrade Projects |
| 2023-12-12 Approved 128-23-24 | Define and Approve 3 Accessibility Enhancement Projects |
| 2023-12-12 Approved 125-23-24 | Define and Approve 2 Student and Family Resource Center Projects |
| 2023-12-12 Approved 124-23-24 | Define and Approve the Middleton Street Elementary School Cooling Tower Replacement Project |
| 2023-12-12 Approved 123-23-24 | Define and Approve 12 Board District Priority and Region Priority Projects |
| 2023-11-14 Approved 111-23-24 | Define and Approve 4 Classroom Upgrade Projects |
| 2023-11-14 Approved 110-23-24 | Define and Approve the John Marshall High School Synthetic Turf Field Replacement Project |
| 2023-11-14 Approved 108-23-24 | Define and Approve 13 Board District Priority and Region Priority Projects |
| 2023-11-14 Approved 107-23-24 | Define and Approve 3 Sustainable Environment Enhancement Developments for Schools (SEEDS) Projects |
| 2023-11-14 Approved 102-23-24 | Define and Approve 2 Charter School Facilities Upgrade Projects |
| 2023-11-14 Approved 074-23-24 | Define and Approve 2 Wellness Center Projects |
| 2023-11-14 Approved 073-23-24 | Approve the Redefinition of the 32nd Street/USC Magnets Major Modernization Project |
| 2023-10-17 Approved 083-23-24 | Define and Approve 7 Board District Priority and Region Priority Projects |
| 2023-10-17 Approved 082-23-24 | Define and Approve 4 Projects to Provide Critical Replacements and Upgrades of School Building/Site Systems and Components |
| 2023-10-17 Approved 076-23-24 | Define and Approve 5 Outdoor Learning Environment Projects |
| 2023-10-17 Approved 008-23-24 | Define and Approve the New Chatsworth Early Education Center Project |
| 2023-09-12 Approved 037-23-24 | Define and Approve the Girls Academic Leadership Academy (GALA) Campus Reconfiguration and Upgrade Project |
| 2023-09-12 Approved 036-23-24 | Define and Approve 7 Board District Priority Projects |
| 2023-09-12 Approved 035-23-24 | Define and Approve 3 Projects to Provide Critical Replacements and Upgrades of School Building/Site Systems and Components |
| 2023-08-22 Approved 020-23-24 | Define and Approve 18 Board District Priority and Region Priority Projects |
| 2023-08-22 Approved 019-23-24 | Define and Approve 2 Charter School Facilities Upgrade Projects |
| 2023-08-22 Approved 018-23-24 | Define and Approve 7 Playground and Campus Exterior Upgrade Projects |
| 2023-08-22 Approved 009-23-24 | Define and Approve 5 Sustainable Environment Enhancement Developments for Schools (SEEDS) Projects |
| 2023-08-22 Approved 007-23-24 | Define and Approve 3 Athletic Facilities Upgrade Projects |
| 2023-06-20 Approved 127-22-23 | Define and Approve 7 Athletic Facilities Upgrade Projects |
| 2023-06-13 Approved 281-22-23 | Approve the Redefinition of the Fairfax High School Major Modernization Project, the Definition of the James J. McBride Special Education Center - Career and Transition Center West / Grand View Boulevard Elementary School Campus Improvement Project |
| 2023-06-13 Approved 280-22-23 | Define and Approve 6 Accessibility Enhancement Projects and 1 Barrier Removal Project |
| 2023-06-13 Approved 279-22-23 | Define and Approve 4 Outdoor Learning Environment Projects |
| 2023-06-13 Approved 278-22-23 | Define and Approve 12 Board District Priority and Region Priority Projects |
| 2023-06-13 Approved 277-22-23 | Define and Approve the Nobel Charter Middle School Fencing and Secure Entry System Project |
| 2023-05-23 Approved 249-22-23 | Approve the Cancellation of 4 Projects |
| 2023-05-23 Approved 248-22-23 | Define and Approve 15 Board District Priority and Region Priority Projects |
| 2023-05-23 Approved 247-22-23 | Define and Approve the 2023-2024 Education Code Section 47614 (Proposition 39) Facilities Renovation Effort |
| 2023-04-18 Approved 210-22-23 | Define and Approve 8 Board District Priority and Region Priority Projects |
| 2023-04-18 Approved 209-22-23 | Define and Approve 4 Sustainable Environment Enhancement Developments for Schools (SEEDS) Projects |
| 2023-04-18 Approved 208-22-23 | Define and Approve the Pio Pico Middle School Roofing Project |
2022 SEP and Amendments
| BOE Report No. and Approval Date |
Subject |
|---|---|
| 2023-03-27 Approved 192-22-23 | Define and Approve 4 Outdoor Learning Environment Projects |
| 2023-03-27 Approved 183-22-23 | Define and Approve 3 Accessibility Enhancement Projects and 2 Barrier Removal Projects |
| 2023-03-27 Approved 181-22-23 | Define and Approve 4 Sustainable Environment Enhancement Developments for Schools (SEEDS) Projects |
| 2023-03-27 Approved 179-22-23 | Update and Approve $33 Million to Phase III of the Drinking Water Quality Program |
| 2023-03-27 Approved 178-22-23 | Define and Approve 26 Board District Priority and Region Priority Projects |
| 2023-01-17 Approved 125-22-23 | Define and Approve 2 Charter School Facilities Upgrade Projects |
| 2023-01-17 Approved 124-22-23 | Define and Approve 5 Proposition 39 Co-Located/Shared Facilities Improvement Projects |
| 2023-01-17 Approved 123-22-23 | Define and Approve a $30 Million Districtwide Program for Cooling Relief at School Cafeteria Kitchens |
| 2023-01-17 Approved 122-22-23 | Define and Approve the 7th Street Elementary Arts Integration Magnet School Retaining Wall and Parking Lot Asphalt Replacement Project |
| 2023-01-17 Approved 121-22-23 | Define and Approve 6 Board District Priority and Region Priority Projects |
| 2022-12-13 Approved 094-22-23 | Define and Approve 2 Early Education Center Outdoor Classroom Projects |
| 2022-12-13 Approved 092-22-23 | Define and Approve 6 Sustainable Environment Enhancement Developments for Schools (SEEDS) Projects |
| 2022-12-13 Approved 091-22-23 | Define and Approve the O’Melveny Elementary School Plumbing Upgrade Project |
| 2022-12-13 Approved 090-22-23 | Define and Approve 6 Board Member Priority and Local District Priority Projects |
| 2022-12-13 Approved 075-22-23 | Define and Approve 5 Outdoor Learning Environment Projects |
| 2022-11-15 Approved 074-22-23 | Approve the Redefinition of 5 Major Modernization Projects at 49th Street Elementary School, Canoga Park High School, Garfield High School, Irving Middle School, and Sylmar Charter High School |
| 2022-11-15 Approved 073-22-23 | Define and Approve 4 School Cafeteria Upgrade Projects |
| 2022-11-15 Approved 072-22-23 | Define and Approve 7 Projects to Provide Critical Replacements and Upgrades of School Building/Site Systems and Components |
| 2022-11-15 Approved 071-22-23 | Define and Approve 19 Board Member Priority and Local District Priority Projects |
| 2022-09-27 Approved 026-22-23 | Define and Approve 2 Sustainable Environment Enhancement Developments for Schools (SEEDS) Projects |
| 2022-09-27 Approved 025-22-23 | Define and Approve 3 Projects to Provide Critical Replacements and Upgrades of School Building/Site Systems and Components |
| 2022-09-27 Approved 024-22-23 | Define and Approve 30 Board Member Priority and Local District Priority Projects |
| 2022-08-30 Approved 011-22-23 | Define and Approve 3 Sustainable Environment Enhancement Developments for Schools (SEEDS) Projects |
| 2022-08-30 Approved 010-22-23 | Define and Approve 9 Charter School Facilities Upgrade Projects |
| 2022-08-30 Approved 009-22-23 | Define and Approve 127 Projects to Provide Critical Replacements and Upgrades of School Building/Site Systems and Components |
| 2022-08-30 Approved 008-22-23 | Define and Approve 31 Board Member Priority and Local District Priority Projects |
| 2022-08-30 Approved 007-22-23 | Define and Approve 6 Accessibility Enhancement Projects and 1 Barrier Removal Project |
| 2022-06-21 Approved 294-21-22 | Redefine the Kennedy High School Comprehensive Modernization Project to Include the Upgrade of the Running Track, Long Jump & High Jump Athletic Facilities |
| 2022-06-14 Approved 347-21-22 | Define and Approve 3 Charter School Facilities Upgrade Projects |
| 2022-06-14 Approved 346-21-22 | Define and Approve 33 Projects to Provide Critical Replacements and Upgrades of School Building/Site Systems and Components |
| 2022-06-14 Approved 301-21-22 | Define and Approve the 24th Street Early Education Center Outdoor Classroom and Campus Upgrade Project |
| 2022-06-14 Approved 299-21-22 | Define and Approve 14 Board Member Priority and Local District Priority Projects |
| 2022-05-10 Approved 295-21-22 | Define and Approve 5 Early Education Center Outdoor Classroom and Campus Upgrade Projects |
| 2022-05-10 Approved 293-21-22 | Define and Approve 9 Board Member Priority and Local District Priority Projects |
| 2022-05-10 Approved 292-21-22 | Define and Approve 18 Projects to Provide Critical Replacements and Upgrades of School Building/Site Systems and Components |
| 2022-05-10 Approved 291-21-22 | Define and Approve the 2022-2023 Education Code Section 47614 (Proposition 39) Facilities Renovation Effort |
| 2022-04-26 Approved 253-21-22 | Define and Approve 2 Charter School Facilities Upgrade Projects |
| 2022-04-05 Approved 267-21-22 | Update the School Upgrade Program to Align the Investments Targeted for Upgrading High School Competitive Athletic Facilities with the New Board of Education Districts for the Los Angeles Unified School District |
| 2022-04-05 Approved 266-21-22 | Define and Approve a Project to Provide Americans with Disabilities Act (ADA) Accessibility Upgrades at Evans Community Adult School |
| 2022-04-05 Approved 265-21-22 | Define and Approve 1 Early Education Center Reopening Project and 4 Early Education Center Outdoor Classroom and Campus Upgrade Projects |
| 2022-04-05 Approved 255-21-22 | Define and Approve 15 Projects to Provide Critical Replacements and Upgrades |
| 2022-04-05 Approved 254-21-22 | Define and Approve 15 Board Member Priority and Local District Priority Projects |
2021 SEP and Amendments
| BOE Report No. and Approval Date |
Subject |
|---|---|
| 2022-03-08 Approved 250-21-22 | Define and Approve the Pacoima Middle School Urban Greening Project |
| 2022-03-08 Approved 245-21-22 | Define and Approve Five Proposition 39 Co-Located/Shared Facilities Improvement Projects |
| 2022-03-08 Approved 234-21-22 | Define and Approve 11 Projects to Provide Critical Replacements and Upgrades of School Building/Site Systems and Components |
| 2022-03-08 Approved 233-21-22 | Define and Approve 15 Board Member Priority and Local District Priority Projects |
| 2022-02-08 Approved 191-21-22 | Define and Approve Two Early Education Center Playground Matting Projects |
| 2022-02-08 Approved 190-21-22 | Define and Approve a Project to Install a Closed-Circuit Television (CCTV) System at the Richard N. Slawson Southeast Occupational Center |
| 2022-02-08 Approved 189-21-22 | Define and Approve 46 Parent and Family Center Classroom Upgrade and Improvement Projects |
| 2022-02-08 Approved 161-21-22 | Define and Approve 22 Projects to Provide Critical Replacements and Upgrades of School Building/Site Systems and Components |
| 2022-02-08 Approved 160-21-22 | Define and Approve 14 Board Member Priority and Local District Priority Projects |
| 2021-12-07 Approved 146-21-22 | Define and Approve the Garfield High School Synthetic Football Field and Track Upgrade Project |
| 2021-12-07 Approved 145-21-22 | Approval of the Project Definition for Site Due Diligence, Planning, and Feasibility Activities at Sylmar Charter High School for a Major Modernization Project |
| 2021-12-07 Approved 144-21-22 | Define and Approve Four Accessibility Enhancement Projects |
| 2021-12-07 Approved 125-21-22 | Define and Approve 14 Projects to Provide Critical Replacements and Upgrades of School Building/Site Systems and Components |
| 2021-12-07 Approved 124-21-22 | Define and Approve 13 Board Member Priority and Local District Priority Projects |
| 2021-12-07 Approved 123-21-22 | Define and Approve Two Sustainable Environment Enhancement Developments for Schools (SEEDS) Projects |
| 2021-11-16 Approved 122-21-22 | Approval of the Project Definition for Site Due Diligence, Planning, and Feasibility Activities at Garfield High School for a Major Modernization Project |
| 2021-11-16 Approved 112-21-22 | Approval of Eight Projects to Provide Critical Replacements and Upgrades of School Building/Site Systems and Components |
| 2021-11-16 Approved 111-21-22 | Approval of 11 Board Member Priority and Local District Priority Projects and Amendment to the Facilities Services Division Strategic Execution Plan to Incorporate Therein |
| 2021-11-16 Approved 029-21-22 | Authorization of Construction Activities and Funding for Eight Projects, Cancellation of Two Projects, and Amendment to the Facilities Services Division Strategic Execution Plan |
| 2021-10-12 Approved 085-21-22 | Approval of Five Major Modernization Project Definitions for Site Due Diligence, Planning, and Feasibility Activities |
| 2021-10-12 Approved 082-21-22 | Define and Approve Seven Projects to Provide Critical Replacements and Upgrades of School Building/Site Systems and Components |
| 2021-10-12 Approved 081-21-22 | Define and Approve 14 Board Member Priority and Local District Priority Projects |
| 2021-09-14 Approved 060-21-22 | Redefine the Roosevelt High School Comprehensive Modernization Project to Include the Expansion and Upgrade of the Football Field, Running Track and Field Event Facilities, and the Baseball and Softball Field |
| 2021-09-14 Approved 037-21-22 | Define and Approve Three Sustainable Environment Enhancement Developments for Schools (SEEDS) Projects |
| 2021-09-14 Approved 036-21-22 | Define and Approve Seven Projects that Address Critical Replacement and Upgrade Needs at Schools |
| 2021-09-14 Approved 035-21-22 | Define and Approve 13 Board Member Priority Projects |
| 2021-08-24 Approved 027-21-22 | Update to the School Upgrade Program to Integrate Measure RR Funding and Priorities |
| 2021-08-24 Approved 011-21-22 | Define and Approve the Franklin High School Concrete Ramp Accessibility Project |
| 2021-08-24 Approved 010-21-22 | Define and Approve 23 Local District Priority and Board Member Priority Projects |
| 2021-06-08 Approved 372-20-21 | Define and Approve Four Accessibility Enhancement Projects |
| 2021-06-08 Approved 371-20-21 | Define and Approve the Richard E. Byrd Middle School Underground Hydronic Piping Replacement Project |
| 2021-06-08 Approved 318-20-21 | Define and Approve Two Local District Priority and Board Member Priority Projects and Cancel One Project |
| 2021-05-11 Approved 317-20-21 | Define and Approve the 2021-2022 Education Code Section 47614 (Proposition 39) Facilities Renovation Effort |
| 2021-05-11 Approved 296-20-21 | Define and Approve Five Local District Priority and Board Member Priority Projects |
| 2021-04-14 Approved 292-20-21 | Authorize Construction Activities for the South Shores Elementary Performing Arts Magnet Classroom Replacement Project |
| 2021-04-14 Approved 282-20-21 | Define and Approve Eight Early Education Center Outdoor Classroom and Campus Upgrade Projects and Cancel One Project |
| 2021-04-14 Approved 280-20-21 | Define and Approve Nine Projects that Address Critical School Repair Needs |
| 2021-04-14 Approved 279-20-21 | Define and Approve Five Local District Priority and Board Member Priority Projects |
2020 SEP and Amendments
| BOE Report No. and Approval Date |
Subject |
|---|---|
| 2021-03-09 Approved 260-20-21 | Authorize Construction Activities for the Amestoy Elementary School Classroom Replacement Project |
| 2021-03-09 Approved 257-20-21 | Define and Approve Three Accessibility Enhancement Projects and Cancel One Project |
| 2021-03-09 Approved 256-20-21 | Redefine the Taft Charter High School Comprehensive Modernization Project to Include the Upgrade of Heating, Ventilation, and Air Conditioning Systems in Seven Classroom Buildings |
| 2021-03-09 Approved 255-20-21 | Define and Approve a Project that Addresses Critical School Safety and Repair Needs at Daniel Pearl Senior High Journalism and Communications Magnet |
| 2021-03-09 Approved 243-20-21 | Define and Approve 11 Local District Priority and Board Member Priority Projects |
| 2021-02-09 Approved 225-20-21 | Define and Approve Three Projects that Address Critical School Repair Needs |
| 2021-02-09 Approved 207-20-21 | Define and Approve 11 Local District Priority and Board Member Priority Projects |
| 2021-01-12 Approved 111-20-21 | Define and Approve Nine Local District Priority and Board Member Priority Projects |
| 2021-01-12 Approved 110-20-21 | Approve Construction Activities for Three Projects that Address Critical School Repair Needs |
| 2020-12-15 Approved 108-20-21 | Authorization to Enter Into a Memorandum of Understanding with the Los Angeles Department of Water and Power and Amendment to the Facilities Services Division Strategic Execution Plan to Approve $15 Million for an Energy Efficient Lighting Upgrade Program |
| 2020-12-08 Approved 107-20-21 | Define and Approve 13 Local District Priority and Board Member Priority Projects |
| 2020-11-10 Approved 074-20-21 | Define and Approve the Career Technical Education Clear Vision Studio Project at Valley Oaks Center for Enriched Studies Magnet |
| 2020-11-10 Approved 073-20-21 | Define and Approve 27 Local District Priority and Board Member Priority Projects |
| 2020-10-06 Approved 025-20-21 | Define and Approve Six Local District Priority and Board Member Priority Projects |
| 2020-09-15 Approved 024-20-21 | Define and Approve 10 Local District Priority and Board Member Priority Projects |
| 2020-08-25 Approved 014-20-21 | Approve a Charter Augmentation Grant for the Bright Star Schools Rise Kohyang Middle School Project |
| 2020-08-25 Approved 013-20-21 | Define and Approve Six Local District Priority and Board Member Priority Projects |
| 2020-06-09 Approved 335-19-20 | Define and Approve Eight Local District Priority and Board Member Priority Projects |
| 2020-06-09 Approved 312-19-20 | Path Forward for the Ocean Charter School Panama Street K- 8 School Project |
| 2020-05-19 Approved 313-19-20 | Define and Approve the 2020-2021 Education Code Section 47614 (Proposition 39) Facilities Renovation Effort |
| 2020-05-19 Approved 299-19-20 | Define and Approve 22 Local District Priority and Board Member Priority Projects |
| 2020-05-19 Approved 298-19-20 | Define and Approve Two Projects that Address Critical School Repair Needs |
2019 SEP and Amendments
| BOE Report No. and Approval Date |
Subject |
|---|---|
| 2020-03-10 Approved 272-19-20 | Define and Approve 45 Local District Priority and Board Member Priority Projects |
| 2020-03-10 Approved 271-19-20 | Define and Approve Two Projects that Address Critical School Repair Needs |
| 2020-03-10 Approved 156-19-20 | Consolidation of Portable Building Programs and Authorization to Sell Used Portable Buildings to the County and City of Los Angeles |
| 2020-02-04 Approved 239-19-20 | Approve Construction Activities for the Palisades Charter High School Plumbing Upgrade Project |
| 2020-02-04 Approved 221-19-20 | Define and Approve Facilities Improvement Projects at 52 School Sites with Proposition 39 Co-Locations in the 2019- 2020 School Year |
| 2020-02-04 Approved 220-19-20 | Define and Approve 16 Local District Priority and Board Member Priority Projects |
| 2019-12-03 Approved 151-19-20 | Define and Approve Five New Local District Priority and Board Member Priority Projects |
| 2019-11-05 Approved 143-19-20 | Define and Approve a Fire Alarm Upgrade Project at West Valley Occupational Center |
| 2019-11-05 Approved 141-19-20 | Define a Classroom Replacement Project at Lawrence Middle School |
| 2019-11-05 Approved 140-19-20 | Define and Approve a Baseball Field Project at Garfield High School |
| 2019-11-05 Approved 139-19-20 | Define and Approve 19 Local District Priority and Board Member Priority Projects |
| 2019-11-05 Approved 138-19-20 | Define and Approve a Project to Address Critical School Repair Needs at Sun Valley Magnet: Engineering Technology School |
| 2019-10-01 Approved 061-19-20 | Define and Approve 18 Local District Priority and Board Member Priority Projects |
| 2019-10-01 Approved 060-19-20 | Define and Approve Two Projects that Address Critical School Repair Needs |
| 2019-10-01 Approved 059-19-20 | Define and Approve Three Sustainable Environment Enhancement Developments for Schools (SEEDS) Projects |
| 2019-09-03 Approved 015-19-20 | Define and Approve Four Accessibility Enhancement Projects |
| 2019-09-03 Approved 014-19-20 | Define and Approve 15 Local District Priority and Board Member Priority Projects |
| 2019-06-18 Approved 415-18-19 | Define and Approve Two Early Education Center Reopening Projects and Redefine One Early Education Center Campus Upgrade Project |
| 2019-06-18 Approved 414-18-19 | Define and Approve 16 Local District Priority and Board Member Priority Projects |
| 2019-06-18 Approved 413-18-19 | Define and Approve Seven Projects that Address Critical School Repair Needs |
| 2019-06-18 Approved 412-18-19 | Define and Approve Three Sustainable Environment Enhancement Developments for Schools (SEEDS) Projects |
| 2019-05-21 Approved 379-18-19 | Approve a Charter Augmentation Grant for the Rise Kohyang High School Project |
| 2019-05-21 Approved 347-18-19 | Approve a Charter Augmentation Grant for the Vaughn Next Century Learning Center New Two-Story Addition Project |
| 2019-05-21 Approved 344-18-19 | Define and Approve Three Board Member Priority Projects |
| 2019-05-21 Approved 343-18-19 | Define and Approve the 2019- 2020 Education Code Section 47614 (Proposition 39) Facilities Renovation Effort. Adopted as Amended. |
| 2019-05-21 Approved 342-18-19 | Define and Approve Eight Projects that Address Critical School Repair Needs |
| 2019-05-21 Approved 329-18-19 | Update to the Energy Efficient Lighting Upgrades Program |
| 2019-04-23 Approved 325-18-19 | Approve $15 Million for Phase III of the Drinking Water Quality Program |
| 2019-04-23 Approved 324-18-19 | Define and Approve 15 Local District Priority and Board Member Priority Projects |
| 2019-04-23 Approved 323-18-19 | Define and Approve Six Projects that Address Critical School Repair Needs |
2018 SEP and Amendments
| BOE Report No. and Approval Date |
Subject |
|---|---|
| 2019-03-19 Approved 289-18-19 | Define and Approve Five Accessibility Enhancement Projects |
| 2019-03-19 Approved 288-18-19 | Define and Approve 12 Local District Priority and Board Member Priority Projects |
| 2019-03-19 Approved 287-18-19 | Define and Approve Four Projects that Address Critical School Repair Needs |
| 2019-02-19 Approved 237-18-19 | Approve the Project Definition Proposal for the Verdugo Hills High School New Chemistry Laboratory Building Project |
| 2019-02-19 Approved 235-18-19 | Define and Approve 27 Local District Priority and Board Member Priority Projects |
| 2019-02-19 Approved 169-18-19 | Approve a High School Student Classroom Furniture Replacement Program |
| 2018-12-11 Approved 171-18-19 | Define and Approve 79 Parent and Family Center Classroom Upgrade and Improvement Projects |
| 2018-12-11 Approved 170-18-19 | Define and Approve Six Board Member Priority Projects |
| 2018-11-13 Approved 138-18-19 | Approve the Project Definition Proposal for the Canoga Park High School Visual and Performing Arts Facilities Upgrade Project |
| 2018-11-13 Approved 137-18-19 | Define and Approve Eight Accessibility Enhancement Projects |
| 2018-11-13 Approved 136-18-19 | Define and Approve 11 Board Member Priority and Local District Priority Projects |
| 2018-11-13 Approved 135-18-19 | Define and Approve Six Projects that Address Critical School Repair Needs |
| 2018-11-13 Approved 092-18-19 | Amend the Facilities Services Division Strategic Execution Plan to update the walk-in freezer modernization program at 306 school sites |
| 2018-10-02 Approved 093-18-19 | Cancel 16 projects which will reduce risks associated with the completion of projects and legacy programs, and/or allow stakeholders to develop additional project proposals subject to review by the BOC and approval by the Board. |
| 2018-10-02 Approved 091-18-19 | Define and Approve 28 Board Member Priority and Local District Priority Projects |
| 2018-09-11 Approved 027-18-19 | Define and Approve Three Sustainable Environment Enhancement Developments for Schools (SEEDS) Projects |
| 2018-09-11 Approved 026-18-19 | Define and Approve 61 Board Member Priority and Local District Priority Projects |
| 2018-06-12 Approved 488-17-18 | Approve the Project Definition Proposal for the 7th Street Elementary School New Food Service Building Project |
| 2018-06-12 Approved 487-17-18 | Define and Approve 10 Early Education Center Outdoor Classroom Projects |
| 2018-06-12 Approved 486-17-18 | Define and Approve 18 Board Member Priority and Local District Priority Projects |
| 2018-06-12 Approved 485-17-18 | Define and Approve a Project to Address Critical School Repair Needs at Mount Gleason Middle School |
| 2018-06-12 Approved 433-17-18 | Define and Approve Three Critical Barrier Removal Projects |
| 2018-05-08 Approved 431-17-18 | Approve the Project Definition Proposal for the Wilson High School Visual and Performing Arts Facilities Improvement Project (Pre-Construction Activities Only) |
| 2018-05-08 Approved 430-17-18 | Accessibility Enhancement Projects: Amendment to the Facilities Services Division Strategic Execution Plan to Define and Approve Eight and Redefine One |
| 2018-05-08 Approved 429-17-18 | Define and Approve the 2018-2019 Education Code Section 47614 (Proposition 39) Facilities Renovation Effort |
| 2018-05-08 Approved 428-17-18 | Define and Approve 18 Board Member Priority and Local District Priority Projects |
| 2018-05-08 Approved 427-17-18 | Define and Approve Three Projects that Address Critical School Repair Needs |
| 2018-05-08 Approved 386-17-18 | Approve a Lunch Shelter Upgrade Project at Rosa Parks Learning Center |
| 2018-04-10 Approved 385-17-18 | Define and Approve the University Pathways Medical Magnet Academy Upgrade Project at Gompers Middle School |
| 2018-04-10 Approved 384-17-18 | Define and Approve the University Pathways Public Service Academy Upgrade Project at Charles Drew Middle School |
| 2018-04-10 Approved 383-17-18 | Define and Approve 15 Board Member Priority and Local District Priority Projects |
| 2018-04-10 Approved 382-17-18 | Define and Approve a Project to Address Fire Damages in the Kindergarten Building at Coliseum Elementary School |
2017 SEP and Amendments
| BOE Report No. and Approval Date |
Subject |
|---|---|
| 2018-03-13 Approved 342-17-18 | Define and Approve 11 Board Member Priority and Local District Priority Projects |
| 2018-03-13 Approved 341-17-18 | Approve Four Project Definition Proposals to Address Critical School Safety and Repair Needs |
| 2018-03-13 Approved 340-17-18 | Define and Approve Eight Accessibility Enhancement Projects |
| 2018-02-13 Approved 294-17-18 | Define and Approve 11 Board Member Priority and Local District Priority Projects |
| 2018-02-13 Approved 293-17-18 | Define and Approve Six Projects that Address Critical School Safety and Repair Needs |
| 2017-12-12 Approved 226-17-18 | Approve Four Project Definition Proposals to Address State Requirements for the Removal of Certain Relocatable Buildings |
| 2017-12-12 Approved 225-17-18 | Define and Approve 17 Board Member Priority and Local District Priority Projects |
| 2017-12-12 Approved 224-17-18 | Define and Approve Four Projects that Address Critical School Safety and Repair Needs |
| 2017-12-12 Approved 098-17-18 | Define and Approve Three Sustainable Environment Enhancement Developments for Schools (SEEDS) Projects |
| 2017-11-14 Approved 190-17-18 | Authorization to Increase the Charter Augmentation Grant for the Ocean Charter School Panama Street K-8 School Project |
| 2017-11-14 Approved 189-17-18 | Approve Project Definition Proposals for Six Classroom Replacement/Addition Projects for Pre-Construction and Limited Construction Activities |
| 2017-11-14 Approved 188-17-18 | Define and Approve Projects to Provide New Adult ADA Compliant Restrooms at 18 Early Education Centers |
| 2017-11-14 Approved 187-17-18 | Define and Approve 22 Board Member Priority and Local District Priority Projects |
| 2017-11-14 Approved 086-17-18 | Approve Six Project Definition Proposals that Address Critical School Safety and Repair Needs |
| 2017-11-14 Approved 065-17-18 | Redefine and Approve 61 Accessibility Enhancement Projects and Allocate $5 Million to the Rapid Access Program to Ensure Alignment with the District's Self-Evaluation and Transition Plan Under the Americans with Disabilities Act |
| 2017-10-10 Approved 087-17-18 | Define and Approve Two Sustainable Environment Enhancement Developments for Schools (SEEDS) Projects |
| 2017-10-10 Approved 085-17-18 | Define and Approve Six Board Member Priority and Local District Priority Projects |
| 2017-10-10 Approved 051-17-18 | Define and Approve the Science Academy STEM Magnet Upgrade Project at East Valley High School |
| 2017-09-12 Approved 050-17-18 | Define and Approve Two Board Member Priority Projects |
| 2017-09-12 Approved 049-17-18 | Define and Approve Three Projects that Address Critical School Repair Needs |
| 2017-08-22 Approved 008-17-18 | Define and Approve 85 Parent and Family Center Classroom Upgrade and Improvement Projects |
| 2017-08-22 Approved 007-17-18 | Define and Approve 16 Board Member Priority and Local District Priority Projects |
| 2017-08-22 Approved 006-17-18 | Define and Approve Five Sustainable Environment Enhancement Developments for Schools (SEEDS) Projects |
| 2017-06-13 Approved 598-16-17 | Approve Project Definitions for Two Classroom Replacement Projects |
| 2017-06-13 Approved 537-16-17 | Define and Approve Evans Community Adult School Information Technology Infrastructure Upgrade Project |
| 2017-06-13 Approved 536-16-17 | Define and Approve a Program to Provide Automated Fire Alarm Dialer Systems at 155 Sites |
| 2017-06-13 Approved 535-16-17 | Define and Approve Various Board Member Priority and Local District Priority Projects |
| 2017-06-13 Approved 534-16-17 | Define and Approve One Project that Addresses Critical School Repair Needs |
| 2017-05-09 Approved 530-16-17 | Define and Approve the 2017-2018 Education Code Section 47614 (Proposition 39) Facilities Renovation Effort |
| 2017-05-09 Approved 529-16-17 | Define and Approve the Installation of Shade Structures at Six Early Education Centers |
| 2017-05-09 Approved 528-16-17 | Define and Approve Four Board Member Priority and Local District Priority Projects |
| 2017-05-09 Approved 527-16-17 | Define and Approve Three Projects that Address Critical School Repair Needs |
| 2017-05-09 Approved 525-16-17 | Authorization to Initiate Activities in Support of the Possible Expansion of Playa Vista Elementary School to Provide Community Overcrowding Relief |
| 2017-04-18 Approved 456-16-17 | Define and Approve Two Sustainable Environment Enhancement Developments for Schools (SEEDS) Projects |
| 2017-04-18 Approved 450-16-17 | Define and Approve Three School-Based Clinics and Wellness Center Projects |
| 2017-04-18 Approved 449-16-17 | Define and Approve Three Board Member Priority and Local District Priority Projects |
| 2017-04-18 Approved 448-16-17 | Define and Approve Six Projects that Address Critical School Repair Needs |
2016 SEP and Amendments
| BOE Report No. and Approval Date |
Subject |
|---|---|
| 2017-03-14 Approved 408-16-17 | Approve a Program to Install Wall-Mounted Changing Tables |
| 2017-03-14 Approved 406-16-17 | Define and Approve the John C. Fremont Senior High School Wellness Center Expansion Project |
| 2017-03-14 Approved 403-16-17 | Define and Approve Six Board Member Priority and Local District Priority Projects |
| 2017-03-14 Approved 402-16-17 | Define and Approve Six Projects that Address Critical School Repair Needs |
| 2017-03-14 Approved 360-16-17 | Update the Food Services Kitchen Equipment Modernization and Upgrade Program |
| 2017-03-14 Approved 253-16-17 | To cancel the projects listed in Attachment A that are currently active but for which the scope as defined is no longer needed or will be addressed through other bond-funded projects. |
| 2017-02-14 Approved 358-16-17 | Define and Approve 16 Board Member Priority and Local District Priority Projects |
| 2017-02-14 Approved 357-16-17 | Define and Approve Eight Projects that Address Critical School Repair Needs |
| 2016-12-13 Approved 256-16-17 | Define and Approve Four Sustainable Environment Enhancement Developments for Schools (SEEDS) Projects |
| 2016-12-13 Approved 252-16-17 | Define and Approve Upgrades at Abram Friedman Occupational Center |
| 2016-12-13 Approved 251-16-17 | Define and Approve Four Board Member Priority and Local District Priority Projects |
| 2016-12-13 Approved 250-16-17 | Define and Approve Five Projects that Address Critical School Repair Needs |
| 2016-12-13 Approved 207-16-17 | Approval of the Wellness Phase 2 Facilities Plan to Identify Eleven Sites for School-Based Clinics and Wellness Center Projects and Amend the Facilities Services Division Strategic Execution Plan to Approve Seven School-Based Clinics and Wellness Center Projects |
| 2016-12-13 Approved 206-16-17 | Approve Project Definitions for Three Projects to Remove and Replace Relocatable Buildings |
| 2016-12-13 Approved 205-16-17 | Approve Project Definitions for 11 Comprehensive Modernization Projects |
| 2016-12-13 Approved 200-16-17 | Define and Approve Projects to Enhance Accessibility for Students or Qualified Members of the Community with Disabilities at 10 Schools |
| 2016-11-15 Approved 204-16-17 | Approve an Increase to the Charter Augmentation Grant for the Monse¿¿or Oscar Romero Charter School Project at Berendo Middle School |
| 2016-11-15 Approved 202-16-17 | Define and Approve Four Board Member Priority and Local District Priority Projects |
| 2016-11-15 Approved 201-16-17 | Define and Approve Three New Projects and Redefine One Existing Project to Address Additional Critical School Repair Needs |
| 2016-10-18 Approved 140-16-17 | Define and Approve 14 Board Member Priority and Local District Priority Projects |
| 2016-10-18 Approved 139-16-17 | Define and Approve Two Projects that Address Critical School Repair Needs |
| 2016-09-20 Approved 076-16-17 | Redefine the Wilmington Park Early Education Center Parking Upgrade Project |
| 2016-09-20 Approved 075-16-17 | Define and Approve 19 Early Education Center Upgrade and Improvement Projects |
| 2016-09-20 Approved 074-16-17 | Define and Approve Two Local District Priority Projects |
| 2016-09-20 Approved 073-16-17 | Define and Approve Five Projects that Address Critical School Repair Needs |
| 2016-09-20 Approved 011-16-17 | Authorization to Initiate Due Diligence Activities for the Potential Use and Development of the Closed Campus of Oso Elementary School |
| 2016-08-23 Approved 010-16-17 | Define and Approve the Boys Academic Leadership Academy Upgrade Project at George Washington Preparatory Senior High School |
| 2016-08-23 Approved 009-16-17 | Define and Approve 45 Board Member Priority and Local District Priority Projects |
| 2016-08-23 Approved 008-16-17 | Define and Approve Four Projects that Address Critical School Repair Needs |
| 2016-08-23 Approved 007-16-17 | Define and Approve Projects to Enhance Accessibility for Students or Qualified Members of the Community with Disabilities at 13 Schools |
| 2016-06-21 Approved 464-15-16 | Define and Approve Phase II Replacement of Deteriorated Playground Matting Systems and Damaged or Obsolete Playground Structures |
| 2016-06-21 Approved 443-15-16 | Redefine the Marshall High School Tower Repair Project |
| 2016-06-21 Approved 442-15-16 | Define and Approve 10 Board Member Priority and Local District Priority Projects |
| 2016-06-21 Approved 441-15-16 | Define and Approve Four Projects that Address Critical School Repair Needs |
| 2016-06-21 Approved 392-15-16 | Define and Approve Projects to Enhance Accessibility for Students or Qualified Members of the Community with Disabilities at 12 Schools and Allocate $2 Million to the Rapid Access Program |
| 2016-05-10 Approved 391-15-16 | Define and Approve a Sustainable Environment Enhancement Developments for Schools (SEEDS) Project at Cheremoya Avenue Elementary School |
| 2016-05-10 Approved 388-15-16 | Define and Approve 42 Parent and Family Center Classroom Upgrade and Improvement Projects |
| 2016-05-10 Approved 387-15-16 | Define and Approve One Board Member Priority and Local District Priority Project |
| 2016-05-10 Approved 386-15-16 | Define and Approve Six Projects That Address Critical School Repair Needs |
| 2016-05-10 Approved 373-15-16 | Define and Approve the 2016-2017 Education Code Section 47614 ("Proposition 39") Facilities Renovation Effort |
| 2016-04-12 Approved 345-15-16 | Define and Approve Two Sustainable Environment Enhancement Developments for Schools (SEEDS) Projects |
| 2016-04-12 Approved 341-15-16 | Approve Charter Augmentation Grants for the Ocean Charter Span School Project and the Vaughn Next Century Learning Center Project |
| 2016-04-12 Approved 340-15-16 | Approval of Project Definitions for Three Comprehensive Modernization Projects and Authorization to Add Classroom Interior Improvement Scope to Current 11 Projects |
| 2016-04-12 Approved 335-15-16 | Define and Approve 12 Board Member Priority and Local District Priority Projects |
| 2016-04-12 Approved 334-15-16 | Define and Approve Four New Projects and Redefine One Existing Seismic Retrofit Project to Address Additional Critical School Repair Needs |
2015 SEP and Amendments
| BOE Report No. and Approval Date |
Subject |
|---|---|
| 2016-03-08 Approved 285-15-16 | Approve $1.85 Million for Phase 1 of a Modernization Program to Upgrade Food Services Kitchen Equipment Districtwide |
| 2016-03-08 Approved 284-15-16 | Approve a $20.5 Million Modernization Program to Upgrade Walk-in Freezers Districtwide |
| 2016-03-08 Approved 283-15-16 | Define and Approve 15 Projects That Address Critical School Repair Needs |
| 2016-02-09 Approved 246-15-16 | Approve Project Definitions for Three Comprehensive Modernization Projects |
| 2016-02-09 Approved 245-15-16 | Define and Approve 11 Board Member Priority and Local District Priority Projects |
| 2016-02-09 Approved 244-15-16 | Define and Approve 16 Projects That Address Critical School Repair Needs and One Project That Addresses Facilities Needs at Dacotah Early Education Center |
| 2015-12-08 Approved 182-15-16 | Approve Project Definitions for Six Comprehensive Modernization Projects and Cancel Two Critical School Repair and Safety Projects (as Amended) |
| 2015-12-08 Approved 181-15-16 | Approve Project Definitions at Two School Sites and Authorize Feasibility Studies at a Third Site for the Facilities Components of the Playa Vista Area Enrollment Growth Plan |
| 2015-12-08 Approved 180-15-16 | Define and Approve Four Sustainable Environment Enhancement Developments for Schools (SEEDS) Projects |
| 2015-12-08 Approved 179-15-16 | Define and Approve Three Board Member Priority and Local District Priority Projects |
| 2015-12-08 Approved 178-15-16 | Define and Approve Seven Projects That Address Critical School Repair Needs |
| 2015-11-10 Approved 157-15-16 | Update to the School Upgrade Program |
| 2015-11-10 Approved 122-15-16 | Define and Approve School Information Technology Network Infrastructure, Equipment, and Phone System Upgrade Projects |
| 2015-11-10 Approved 121-15-16 | Define and Approve 10 Board Member Priority and Local District Priority Projects |
| 2015-11-10 Approved 072-15-16 | Define and Approve Three Projects That Address School Needs Identified by Board District 3 |
| 2015-11-10 Approved 071-15-16 | Define and Approve 21 Projects That Address Critical School Repair Needs |
| 2015-09-01 Approved 025-15-16 | Define and Approve a Project to Address the Fire-Damaged Oral Arts Classroom at Locke College Preparatory Academy |
| 2015-09-01 Approved 023-15-16 | Define and Approve the Girls Academic Leadership Academy Upgrade Project at Los Angeles High School |
| 2015-09-01 Approved 022-15-16 | Define and Approve Two Sustainable Environment Enhancement Developments for Schools (SEEDS) Projects |
| 2015-09-01 Approved 019-15-16 | Define and Approve Six Projects to Upgrade Adult and Career Education Facilities |
| 2015-09-01 Approved 018-15-16 | Define and Approve 69 Board Member Priority and Educational Service Center Priority Projects |
| 2015-09-01 Approved 017-15-16 | Define and Approve a Phase II Program to Mitigate Lead in Drinking Water to Eliminate the Need for Daily Flushing of Fixtures at All District School Sites |
| 2015-09-01 Approved 016-15-16 | Define and Approve 14 Projects That Address Critical School Repair Needs |
| 2015-09-01 Approved 015-15-16 | Define and Approve Projects to Enhance Accessibility for Students or Qualified Members of the Community with Disabilities at 20 Schools |
| 2015-06-09 Approved 501-14-15 | Define and Approve Ten Projects that Address Critical School Repair Needs |
| 2015-06-09 Approved 499-14-15 | Plan to Define the International Studies Learning Center Addition Project |
| 2015-06-09 Approved 498-14-15 | Define and Approve Five Sustainable Environment Enhancement Developments for Schools (SEEDS) Projects |
| 2015-05-12 Approved 470-14-15 | Approve a Water Conservation Program |
| 2015-05-12 Approved 469-14-15 | Define and Approve Seven Projects that Address Critical School Repair Needs |
| 2015-05-12 Approved 468-14-15 | Define and Approve New Science Laboratory Facilities Projects at Two Schools |
| 2015-05-12 Approved 467-14-15 | Approve the Use of a Design-Build Contract for the Porter Ranch Community School Classroom Addition Project |
| 2015-05-12 Approved 466-14-15 | Define Two New Classroom Addition Projects |
| 2015-05-12 Approved 423-14-15 | Define and Approve the 2015-2016 Education Code Section 47614 ("Proposition 39") Facilities Renovation Effort |
| 2015-04-15 Approved 426-14-15 | Define and Approve Six Projects that Address Defective Synthetic Turf Fields |
| 2015-04-15 Approved 425-14-15 | Redefine the Project to Repair Slope Failure at Marquez Charter School as the Marquez Charter School Outdoor Learning Center Project and Approve the Revised Project |
| 2015-04-14 Approved 428-14-15 | Define and Approve Eleven Board Member Priority and Educational Service Center Priority Projects |
| 2015-04-14 Approved 427-14-15 | Define and Approve the Moneta Continuation High School Improvement Project |
| 2015-04-14 Approved 424-14-15 | Define and Approve Six Projects that Address Critical School Repair Needs |
2014 SEP and Amendments
| BOE Report No. and Approval Date |
Subject |
|---|---|
| 2015-03-10 Approved 377-14-15 | Approve $30 Million of Energy Efficient Lighting Upgrades |
| 2015-03-10 Approved 376-14-15 | Define and Approve Three Projects that Address Critical School Repair Needs |
| 2015-03-10 Approved 375-14-15 | Approve an Increase to the Charter Augmentation Grant for the Accelerated Charter Elementary School Project |
| 2015-03-10 Approved 374-14-15 | Define and Approve Four Sustainable Environment Developments for Schools (SEEDS) Projects |
| 2015-03-10 Approved 373-14-15 | Identification of 11 School Sites for the Development of Comprehensive Modernization Projects |
| 2015-02-10 Approved 331-14-15 | Define and Approve Ten Board Member Priority and Educational Service Center Priority Projects |
| 2015-02-10 Approved 329-14-15 | Define and Approve a Food Service Project at 93rd St ES |
| 2015-02-10 Approved 328-14-15 | Define and Approve Six Projects that Address Critical Repair Needs |
| 2015-02-10 Approved 216-14-15 | Define and Approve Twenty-Eight Parent and Family Center Upgrade and Improvement Projects |
| 2015-02-10 Approved 214-14-15 | Define and Approve Seven Projects That Address School Needs Identified by Board District 3 |
| 2015-01-13 Approved 296-14-15 | Define and Approve Nine Sustainable Environment Enhancement Developments for Schools (SEEDS) Projects |
| 2014-12-09 Approved 217-14-15 | Approve an Increase to the Charter Augmentation Grant for the Monsenor Oscar Romero Charter School Project at Berendo Middle School, and to Define and Approve the Berendo Middle School Campus Improvement Project |
| 2014-12-09 Approved 215-14-15 | Define and Approve Twenty Board Member Priority and Educational Service Center Priority Projects |
| 2014-12-09 Approved 213-14-15 | Define and Approve Seven Projects That Address Critical Repair Needs |
| 2014-11-18 Approved 173-14-15 | Define and Approve Capital Improvements to Projects to Enhance Accessibility for Staff and Students with Disabilities at Nine Schools |
| 2014-11-18 Approved 172-14-15 | Define and Approve Seven Projects That Address Critical Repair Needs |
| 2014-11-18 Approved 171-14-15 | Define and Approve Ten Sustainable Environment Enhancement Developments for Schools (SEEDS) Projects |
| 2014-10-14 Approved 103-14-15 | Define and Approve the University High School Music Performing Arts Career Technical Education (CTE) Project |
| 2014-10-14 Approved 102-14-15 | Define and Approve Eight Projects That Address Critical School Repair Needs |
| 2014-10-14 Approved 101-14-15 | Define and Approve Five Sustainable Environment Enhancement Developments for Schools (SEEDS) Projects |
2013 SEP and Amendments
| BOE Report No. and Approval Date |
Subject |
|---|---|
| 2014-09-09 Approved 049-14-15 | Redefine the Monroe High School Industrial Arts Building Rehabilitation Project as the Monroe High School Industrial Arts Building Replacement Project and Approve the Revised Project |
| 2014-09-09 Approved 048-14-15 | Consolidate and Update Two Facilities Improvement Projects at Crenshaw High School |
| 2014-09-09 Approved 047-14-15 | Define and Approve 12 Projects That Address Critical School Repair Needs |
| 2014-09-09 Approved 046-14-15 | Define and Approve Alterations and Improvements and Board Member Priority Projects |
| 2014-06-10 Approved 503-13-14 | Plans to Allocate Measure Y Funds to Two Projects Financed by Certificates of Participation |
| 2014-06-10 Approved 500-13-14 | Define and Approve Four Pilot Small School Facilities Reconfiguration and Upgrade Projects |
| 2014-06-10 Approved 499-13-14 | Define and Approve Four Projects to Address Critical School Repair Needs |
| 2014-06-10 Approved 494-13-14 | Cancel 335 Unfunded Projects and 19 No Longer Needed Projects |
| 2014-06-10 Approved 493-13-14 | Define and Approve the Diane Watson Career Center Project |
| 2014-06-10 Approved 492-13-14 | Define and Approve a Library and Multi-Purpose Room Project at Aggeler Opportunity High School |
| 2014-06-10 Approved 491-13-14 | Define and Approve Eleven Board Member Priority and Alteration and Improvement Projects |
| 2014-05-13 Approved 393-13-14 | Define and Approve Eleven Projects to Address Critical School Repair Needs |
| 2014-05-13 Approved 392-13-14 | Redefine and Approve School Information Technology Network Infrastructure and Equipment Upgrade Projects |
| 2014-05-13 Approved 342-13-14 | Define and Approve the 2014-2015 Education Code Section 47614 ("Proposition 39") Facilities Renovation Effort. |
| 2014-04-08 Approved 343-13-14 | Define and Approve the Network Infrastructure and Equipment Upgrade Project at Helen Bernstein High School. |
| 2014-04-08 Approved 340-13-14 | Define and Approve 10 Board Member Priority and Alteration and Improvement Projects. |
| 2014-04-08 Approved 337-13-14 | Define and Approve Three Projects to Address Critical School Repair Needs. |
| 2014-04-08 Approved 335-13-14 | Define and Approve Board District 3 Capital Improvement Program Priority Project at Pomelo Community Charter School to Create Secondary Pedestrian Access. |
| 2014-04-08 Approved 333-13-14 | Define and Approve a Board District 3 Capital Improvement Program Priority Project at Mulholland Middle School to Create a Robotics Lab. |
| 2014-04-08 Approved 329-13-14 | Define and Approve the Mandarin and English Dual- Language Immersion Program Expansion Project. |
| 2014-03-04 Approved 277-13-14 | Define and Approve Five Projects to Address Critical School Repair Needs |
| 2014-03-04 Approved 276-13-14 | Define and Approve Eighteen Board Member Priority and Alteration and Improvement Projects |
| 2014-02-11 Approved 248-13-14 | Define, Redefine, and Approve School Information Technology Network Infrastructure and Equipment Upgrade Projects. |
| 2014-01-14 Approved 192-13-14 | Define and Approve an Underground Piping Project at Monte Vista Elementary School. |
| 2014-01-14 Approved 191-13-14 | Define and Approve 107 Projects to Replace Deteriorated Playground Matting Systems and/or Structures. |
| 2014-01-14 Approved 143-13-14 | Establish the School Upgrade Program (SUP) |
| 2013-11-12 Approved 103-13-14 | Define and Approve the Richard E. Byrd Middle School (Byrd Middle School) Heating, Ventilation, and Air Conditioning (HVAC) System Replacement Project. |
| 2013-11-12 Approved 102-13-14 | Define and Approve an Access Compliance Upgrade Project at Chatsworth High School. |
| 2013-11-12 Approved 101-13-14 | Define and Approve Four Major Repair Projects Deemed to be Urgent in Nature, as listed in Attachment A. |
| 2013-11-12 Approved 100-13-14 | Approve an Augmentation Grant for the Chime Institute Schwarzenegger Community School (Chime) K-8 Expansion Project. |
| 2013-11-12 Approved 092-13-14 | Define and approve ten Alteration and Improvement (A&I) and Board Member Priority (BMP) projects and authorize the Chief Facilities Executive, and/or his designee, to make any purchases associated with these projects. |
| 2013-10-01 Approved 042-13-14 | Define and Approve an Augmentation Grant for a Vaughn Charter Project. |
| 2013-10-01 Approved 041-13-14 | Cancel an Augmentation Grant for the Rehabilitation of Highlander Elementary School by Ivy Bound Academy Charter School. |
| 2013-08-20 Approved 016-13-14 | Define and Approve Monroe High School Industrial Arts Building Rehabilitation Project. |
| 2013-08-20 Approved 015-13-14 | Add Lorena Elementary School to the 2013-2014 Proposition 39 facilities renovation effort. |
| 2013-08-20 Approved 014-13-14 | Define and Approve Fourteen Board Member Priority and Alteration and Improvement Projects. |
| 2013-07-02 Approved 003-13-14 | Define and Approve Six Board Member Priority and Alteration and Improvement Projects |
| 2013-07-02 Approved 002-13-14 | Add 330 Schools and Additional Funding to the Removal and Replacement of Fold-up Tables and Benches Program. |
| 2013-06-18 Approved 318-12-13 | Approve a Charter Augmentation Grant for the Camino Nuevo Charter Academy Project and Authorization to Negotiate and Execute All Agreements Necessary for the Financing, Construction and Operation of a Permanent Charter School Facility |
| 2013-06-18 Approved 317-12-13 | Define and Approve 309 School Facilities Improvement Projects |
| 2013-06-18 Approved 316-12-13 | Define and Approve Thirty-Four Board Member Priority and Alteration and Improvement Projects |
2012 SEP and Amendments
| BOE Report No. and Approval Date |
Subject |
|---|---|
| 2013-05-17 Approved 259-12-13 | Define and Approve a Campus-Wide Fire Alarm Project at Verdugo Hills High Schools. |
| 2013-04-16 Approved 235-12-13 | Define and Approve Five Board Member Priority and Alteration and Improvement Projects. |
| 2013-04-16 Approved 233-12-13 | Define and Approve the 2013-2014 Proposition 39 Facilities Renovation Effort. |
| 2013-04-16 Approved 232-12-13 | Define and Approve Safety Related Facilities Upgrades at Ten Early Education Centers. |
| 2013-03-19 Approved 198-12-13 | Define and Approve Six Board Member Priority and Alteration and Improvement Projects |
| 2013-03-19 Approved 197-12-13 | Define and Approve Early Education Center Nature Explore Classroom Projects |
| 2013-03-19 Approved 156-12-13 | Define and Approve 76 Early Education Center Upgrade and Improvement Projects |
| 2013-02-12 Approved 155-12-13 | Cancel 191 and Unfund 25 Projects. |
| 2013-02-12 Approved 154-12-13 | Define and Approve Non Air Conditioning Projects. |
| 2012-12-11 Approved 086-12-13 | Define and approve Thirteen Alteration and Improvement and Board Member Priority Projects. |
| 2012-11-23 Approved 070-12-13 | Define and Approve 21 Parent and Family Center Upgrade and Improvement Projects. |
| 2012-11-13 Approved 050-12-13 | Define and approve a Small Learning Communities Modernization Project at Venice High School. |
| 2012-10-09 Approved 051-12-13 | Define the San Pedro HS Baseball Field Upgrade Project |
| 2012-09-11 Approved 014-12-13 | Approve a Charter Augmentation Grant for the Monsenor Oscar Romero Charter School (MORCS) project and authorization to execute a Development & Lease Agreement for the financing, construction and operation of a permanent facility on a portion of the Berendo MS campus |
| 2012-08-21 Approved 015-12-13 | Define and approve 15 Major Repairs projects |
| 2012-08-21 Approved 013-12-13 | Define and approve 41 Board District 3 Capital Improvement Program projects |
| 2012-08-21 Approved 012-12-13 | Define and approve 26 Alteration & Improvement and Board Member Priority projects |
| 2012-08-21 Approved 011-12-13 | Define and approve the Fort MacArthur Auto Shop Project |
| 2012-08-21 Approved 010-12-13 | Add 4 projects and additional funding for the Replacement of Fold-Up Tables/Benches Program |
| 2012-06-28 Approved 325-11-12 | Cancel and add one 2012-13 Proposition 39 Charter School Renovation Project |
| 2012-06-28 Approved 324-11-12 | Approval of the 2012 Facilities Services Division Strategic Execution Plan |
| 2012-06-28 Approved 323-11-12 | Approve $6 Million of School Energy Conservation lighting upgrades |
| 2012-06-12 Approved 251-11-12 | Define and approve 26 Alteration & Improvement and Board Member Priority projects at various schools |
| 2012-05-08 Approved 238-11-12 | Add up to seventy (70) 2012-13 Proposition 39 Charter School Renovation Projects |
| 2012-05-08 Approved 237-11-12 | Approve Charter Augmentation Grants for Granada Hills Charter Schools and Accelerated Charter ES Expansion Projects |
| 2012-05-08 Approved 204-11-12 | Define and approve 3 Major Repair projects |
2011 SEP and Amendments
| BOE Report No. and Approval Date |
Subject |
|---|---|
| 2012-04-10 Approved 207-11-12 | Cancel 2 PV installations and approve 7 new installations at various schools |
| 2012-04-10 Approved 206-11-12 | Define and approve a project to abate asbestos at Marshall HS Admin Bldg |
| 2012-04-10 Approved 205-11-12 | Define and approve 100 elementary school Facelift projects |
| 2012-04-10 Approved 203-11-12 | Define and approve a Parent & Family Center Upgrade & Improvement Project at Miramonte ES |
| 2012-04-10 Approved 202-11-12 | Define and approve 8 A&I and BMP projects at various schools |
| 2012-04-10 Approved 201-11-12 | Cancel 633 and unfund 288 projects |
| 2012-02-14 Approved 143-11-12 | Update the ADA MCD On_Demand Accessibility Program: Institute the Rapid Access Program and cancel projects |
| 2012-02-14 Approved 142-11-12 | Define and approve 22 Parent & Family Center Upgrade & Improvement projects |
| 2012-02-14 Approved 141-11-12 | Define and approve 16 A&I and BMP projects at various schools |
| 2012-01-10 Approved 127-11-12 | Define and approve 2 additional ADA MCD On-Demand Accessibility projects |
| 2012-01-10 Approved 126-11-12 | Cancel a $3 Million grant for the Vaughn ELA Charter School Expansion Project |
| 2012-01-10 Approved 125-11-12 | Define and fund 5 MR Major Repairs projects at various schools |
| 2012-01-10 Approved 114-11-12 | Define and approve 2 CTE projects |
| 2011-12-13 Approved 113-11-12 | Define and approve 10 A&I and BMP projects at various schools |
| 2011-10-11 Approved 066-11-12 | Define and approve 2 additional MCD On-Demand Accessibility projects |
| 2011-10-11 Approved 065-11-12 | Allocate $4.4 Million for the removal & replacement of Fold-Up Tables/Benches Program at 111 schools |
| 2011-10-11 Approved 064-11-12 | Define and approve a BM Discretionary project at La Conte MS |
| 2011-09-13 Approved 035-11-12 | Define and approve 5 BM Discretionary projects at various schools |
| 2011-09-13 Approved 034-11-12 | Define and approve the Joint Use and Innovation Fund Track & Field Improvement project at University HS |
| 2011-09-13 Approved 033-11-12 | Define and approve 3 Board District 4 CIPR projects |
| 2011-09-13 Approved 032-11-12 | Define and approve the Innovation Fund Wellness Center Project at Crenshaw HS |
| 2011-09-13 Approved 008-11-12 | Update the Photovoltaic Program |
| 2011-06-21 Approved 413-10-11 | Add 48 A&I and BMP projects at various schools |
| 2011-06-21 Approved 409-10-11 | Define the South Region EEC #3 Project |
| 2011-06-21 Approved 361-10-11 | Add forty-four (44) 2011-12 Prop 39 School Renovation projects |
| 2011-06-21 Approved 354-10-11 | Fund 6 additional MCD On-Demand Accessibility projects |
| 2011-06-21 Approved 291-10-11 | Approval of the 2011 FSD Consolidated SEP |
| 2011-06-14 Approved 341-10-11 | Allocate $20 Million for the development of Parent Center Upgrade & Improvement projects |